


Project Management & Disaster Recovery
EMA is a comprehensive project management tool for disaster recovery teams — tracking FEMA-compliant debris removal, emergency site remediation, and building repair inventories with integrated GPS mapping, contractor documentation, and labor time tracking.
Track debris removal, emergency work, roads, buildings, utilities, and parks across FEMA Categories A–G and Z with GPS mapping and load-ticket documentation.
Clock in/out for force-account employees and contractors, with automatic straight-time and overtime calculation tied to each damaged facility.
Generate professional PDF project reports and cost-tracking CSVs ready for FEMA submission, including Hazard Mitigation (Appendix J) proposals.
Estimate materials, debris, and costs for FEMA disaster recovery projects
Uses trunk cylinder volume × 1.6 canopy factor. Densities: softwood 800 lb/cy, hardwood 1,100 lb/cy, mixed 1,000 lb/cy (green weight).
Density: vegetative 500 lb/cy, construction 1,000 lb/cy, white goods 250 lb/cy (compacted).
Density of Rip Rap (6–12"): 2,410 lb/yd³ (1.21 t/yd³).
Ready-mix in cubic yards, or bag count (60 lb = 0.45 cu ft, 80 lb = 0.6 cu ft).
Asphalt hot mix density: ~145 lb/cu ft (3,915 lb/cu yd).
Shopping List